Notice: Function WP_Object_Cache::add was called incorrectly. Cache key must not be an empty string. Please see Debugging in WordPress for more information. (This message was added in version 6.1.0.) in /home/doctoran/public_html/freedomtreefinancial.com/wp-includes/functions.php on line 6114
Principle

Principle

Negotiation energy-saving ball mill works and maintenance Energy-saving ball mill works and maintenance.Working Principle: This machine is a horizontal cylindrical rotating device, outer gear, the two positions, lattice type negotiation energy-saving ball mill.By material from the feed device into the compound by the air shaft spiral evenly into the ball mill the first warehouse, the warehouse there are paths which liner or corrugated liner, built with different specifications steel ball, cylinder to convey the action to generate centrifugal force to the ball a certain height After the fall AOL and abrasive materials. alicey999 The material in the first position, the coarse grinding, the single-layer diaphragm plate into the second position, the warehouse lined with flat lining, steel ball, the material further grinding. The powder is discharged through the discharge grate to complete the homework grinding. Educate yourself with thoughts from Jonah Bloom. Negotiation energy ball mill maintenance and inspection, all lubricants in ball mills put into continuous operation a month Jaw crusher should be all released, thoroughly cleaned and replaced with new oil.After the combination of repair about oil change eleven every six months.2, lubrication points, lubrication and oil level at least every four hours, check again, the ball mill operation, the main bearing oil temperature rise does not exceed 55?4, the normal operation of the mill, the transmission shaft and reducer temperature rise of not more than 55? the maximum does not exceed 60?5, large and small gear transmission is smooth and no abnormal noise.Necessary, timely adjustment of the jaw crusher gap.6, negotiation energy-saving ball mill brick making machine running smoothly, without a strong shock. 7, the motor current should be no unusual xray., ball mill: The connected fastener loosening, joint surface spill water of the five tax evasion, seamless mine phenomenon.9, the ball is added according to the wear in a timely manner.10, if found to be not normal circumstances should be immediately stopped grinding test.To negotiation maintenance of energy-saving ball mill of the work often.Maintenance of a direct impact on the operation rate and service life of the negotiation energy-saving ball mill.Order to detect the deficiency and eliminate hidden dangers, and to ensure its negotiation energy-saving ball mill to normal operation. Note: In addition to routine Cone crusher price maintenance, but also need to stop scheduled grinding (recommended once a month) for critical components such as a hollow shaft, main bearings, cylinder, reducer, size and other gear for really check for a specific record.Repair and overhaul plan the appropriate treatment and layout of the order of priority in accordance with the defect situation..

Comments are closed.